Promotion of tendering for the first stage of the entry road and hoisting platform for the 200MW wind power project of Shirenliang Shifenliang in Hebei Province

Promotion of tendering for the first stage of the entry road and hoisting platform for the 200MW wind power project of Shirenliang Shifenliang in Hebei Province

1.1 Bidding Conditions “Planning and Certification of 200MW Wind Power Project of Shirenliang in Paddy Field in Hebei Province” (Yanfa Change Energy Nuclear Marking [2014] No. 65); “Approval of the Agreement on Investment in Construction of Shirenliang Shimanliang 200,000kW Wind Power Project in Hebei Province” (Guodian Jishui New Letter [2015] No. 44).
1.3 Project Overview and Bidding Scope
1.3 Project Overview and Bidding Scope
1.3.1 Project Name: The first section of the entry road of the Shirenliang 200MW wind power project in the paddock of Hebei Province, the initial stage of the lifting platform, and the excavation and backfilling of the fan foundation.
1.3.2 Project location: Within the area belonging to Yudaokou Township, Chengzi Township, Yudaokou State-owned Ranch, and Mulan Forestry Administration, Weichang County, Chengde City, Hebei Province.
Project Scale: 54km approach roads and divisions of 100 foundation hoisting platforms in the area, such as primary leveling, foundation excavation and backfilling projects, etc.
Quality Objectives: The overall quality of the project has reached excellent grades, high standards have been met, and the score rate is over 90%, setting a provincial superior project.
Progress goal: Ensure that the construction schedule, completion time, and milestones of the project milestones are completed on time.
A tender section: This section is about 14.5 kilometers of access roads, the initial stage of lifting platform and fan foundation excavation, backfilling and other projects, in 2016, at least 20 foundations and above the completion of the earth-moving fan foundation and the conditions for pouring.
Safety target: see attachment
1.3.3 Bidding scope and content:
The new road of the approach road is about 54km, and the width of the full line base is 6m (excluding the road curve, the Huiche section and some special road sections), the width of the road surface design is 5m (the permanent road surface is restored to 4m), and the road surface is 300mm thick. ; 100-based wind turbines hoisting platform at the beginning of the flat and in the tender section of the fan foundation and box foundation foundation earthwork excavation and backfill engineering.
This project is the clear surface, roadbed, road surface engineering and widening and repair of the original road at the road length of 54km of the newly-built road in the site area, and the foundation and box foundation foundation of the wind turbine foundation and box foundation of the 100 base wind power generator unit lifting platform. Digging, backfilling and other projects.
The bid is divided into three separate bid sections (bidders can vote in three bid sections, but bidders can only take one bid section. If the overall ranking of two or three bid sections is first, it is beneficial to the tenderee. Under the principle, the tenderer will determine the bidders’ bids; as the road construction design drawings of this project are still in the optimization stage, the bid winner shall undertake to unconditionally agree to optimize the design drawings and the project volume, and agree to optimize the project volume and bids. The unit price is recalculated to form the final fixed contract price.)
A tender section: about 14.5 kilometers of newly built on-site roads and the hoisting platform for wind turbines in the region (starting point 97B to the substation area, including connecting with multiple highways, connecting with the original road, including all workloads in the design documents) and within the region Fan foundation and box foundation foundation earthwork excavation, backfilling, etc., specific location, see the bid section is divided into floor plan.
The main content of this tender tender:
1. Before the start of each tender road, assist the tenderer to confirm the boundary according to the construction drawing and the red line drawing of land acquisition and the requirements of the local government, ranch, and the Bureau of Management, and carry out the work of setting and placing the pile;
2. Each tender bidder shall consider the earth-rock balance and select the appropriate waste slag yard according to the on-site field survey and construction drawings and the project quantity list.
3. According to the construction drawings, the construction of approach roads and hoisting platform Chuping (returning to permanent roads after entering the production and power generation approach roads), fan foundation and earth-rock excavation and backfill construction of the box foundation will be carried out;
4. Excavation and backfilling of earthwork and earthwork of fan foundation and box-transformation foundation (pre-excavation positioning, elevation measurement of original ground floor, base-bottom measurement, excavation construction plan, clear topsoil, fill earth, spoil soil and other technical requirements and Technical data shall be compiled and managed by the wind turbine foundation construction unit);
5. During the entire construction process and during the defects of the wind power project, the roads will be repaired and maintained to ensure the smoothness of the transportation roads;
6. The Shirenliang 200WM wind power project involves regional coordination work during the construction process:
(1) Responsible for the coordination of all construction procedures before construction and during construction;
(2) Responsible for the smooth and coordinated work of roads for the construction of tenders during the construction of the entire project;
(3) Bidders shall strictly follow construction drawings and scope of land acquisition. Cross-border construction is strictly prohibited. All problems caused by cross-border construction are resolved by bidders themselves, and all costs incurred and losses incurred to tenderers are also the responsibility of bidders.
7. Responsible for the start of the project until the project is put into operation, all villagers work and local government coordination work, the cost is included in the bid price (but not separate items).
Physical items include, but are not limited to:
The initial construction of approach roads and hoisting platforms, excavation and backfilling of foundations for fan foundations, etc.
Technical standards refer to the technical documents section and construction drawings.
1.4 Bidder's Qualification Requirements No. of Section Title Bidder's Finance, Qualification and Performance Requirements
1
Approach road section
15. The bidder did not appear to have been listed as a dishonest executor during the evaluation period of the project. It was specifically determined that the list of information on the list of untrustworthy executors in the national courts was published and searched (shixin.court.gov.cn) and the National Development and Reform Commission. Credit China () website search results prevail.
1. The bidder must have an independent legal personality; the bidder may not directly or indirectly contact the bid inviting party or the company that it hires or has hired, and prepares technical specifications and other documents or provides consulting services for the bid, including its subsidiaries. Any association
2. The legal representatives of the company are two or more legal entities of the same person. The parent company, wholly-owned subsidiary company and its holding company may not bid at the same time in the bidding for the same bid.
3. The bidder shall have the Grade I or Grade II Certificate of the General Contracting for Power Engineering Construction issued by the Ministry of Housing and Urban-Rural Development or the General Contracting for the Construction of Highway Engineering, and be available on the website of the Ministry of Housing and Urban-Rural Development. ;
4, bidders registered capital of 30 million yuan and above;
5. The bidder must have qualifications and capabilities in construction, quality control, operation and management in areas such as professional technology, construction equipment, personnel organization, performance experience, and financial resources (no losses in the previous year). The bidder was not in the order of being suspended from business, the property was taken over, frozen, bankrupted and reorganized;
6, bidders must have good bank credit and business reputation.
7. The bidder has the technical force, equipment and quality management ability to implement this bidding project, and the bidder must have certificates such as quality, environment, and occupational health and safety management system certification;
8. The bidder must have three years of similar project performance or construction of a grade two or above highway subgrade project;
9. Project managers intending to appoint this project must hold a qualification certificate issued by the “Ministry of Housing and Urban-Rural Development” for the registration of the second-tier constructor; they must have two or more similar performances or performances for the road subgrade project, and the age must not exceed 50 years of age.
10. The technical person in charge of the project to be appointed must have the title of an intermediate engineer of the relevant project series, and must have two or more similar or highway project achievements;
11. The person in charge of safety of the project to be appointed and the special responsibility for safety must have a safety management qualification certificate issued by the administrative or industry competent authority or a qualification certificate for the person in charge of safety;
12. The bidder must have professional surveying and mapping personnel.
13. The on-site survey confirmation signed by the tenderer's representative shall be provided in the bidding documents, otherwise it shall be deemed to be abolished.
14, this tender does not accept the Commonwealth bid;
1.5 Potential bidders wishing to purchase tender documents should first register membership matters.
1.6 Selling Bidding Documents:
The tender documents are purchased using the online payment model (wireless transfer, online banking transfer, on-site cash payment and other purchase methods are not accepted). The system also supports corporate online banking payment and personal online banking payment.
1.6.1 If purchased through a company account, company accounts must have online banking capabilities. When online payment is made, this website will be redirected (linked) to the bank website selected by the purchaser.
1.6.2 If purchased through a personal account, it will be considered that the purchaser has obtained authorization from the company and is equivalent to a company purchase. Before you purchase, verify that the online payment limit of your bank card is not less than the selling price of the bidding documents, so as not to affect the purchase of the bidding documents.
1.6.3 The bidder must be the bidder. The basic information such as bidder's name, correspondence address, contact person, and contact information that the potential bidder fills in on the platform must be accurate, and the information on the whole process of tendering and bidding should be issued and contacted.
1.6.4 After successful payment, bidders directly download the electronic version of the bidding documents from the Internet. The tenderer/bidding agency does not provide any paper tender documents. Successful payment means that the tender documents have been sold. Except for the reasons of the tenderer or the bidding agency, the tender documents will not be refunded once sold.
1.6.5 The bidding agency will mail the commercial invoice for the bidding documents to potential bidders as soon as possible according to the mailing address filled in when purchasing the bidding documents.
1.6.6 If the bidding document fails to be purchased or other problems, please contact customer service center.
1.7 Date of Sale of Bidding Documents: The tender documents will be sold from 09:00 on September 29, 2016 to 16:00 on October 10, 2016.
1.8 Sale price of tender documents and bid security serial number Project name Quantity Bidding Document Price (yuan)
Time period tender number bid bond (yuan)
1
Approach road section
1500 yuan see the tender documents.
GDCX02-SGZB16-0319/01
160000 yuan
1.9 Deadline of bidding documents: At 11:00 (Beijing time) on October 25, 2016, overdue or non-compliant tender documents are not accepted.
1.10 Bid opening time and place: October 25, 2016 at 11:00.
1.12 The tenderer refuses to accept the tender documents delivered late or not delivered to the designated place.
Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.