I. Basic situation of the project
Source of funds for the project: Self-financing and bank loans
Second, the scope of tender
1. List of tender bids
2. Main construction content
No.
Tender number
Section name
main indicators
Bidding Document Price (yuan)
1
C02000111SZ02WZ070000001
Conversion of Desulphurization System for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
Conversion of desulphurization system for ultra-low emission of No. 2 unit of No. 2 unit of No. 1 unit of Nayong Power Plant of Guizhou Jinyuan Co., Ltd. This project adopts EPC general contracting method, including related systems and its associated equipment, civil buildings (structures) (including ground treatment) survey, design, manufacture, supervision and inspection, transportation, warehousing, pre-assembly site, removal of existing equipment (including displacement and restoration of construction equipment, etc.) and transportation to the site designated by the owner, and New equipment installation, commissioning, technical service, training, trial operation and performance assurance of the entire system and final delivery and commissioning, etc.; and can meet the needs of normal operation. The scope of this tender includes "four connections and one leveling" and does not include the corresponding performance evaluation test technical services for this project.
2000
2
C02000111SZ02WZ070000002
Transformation of Denitrification System for Ultra Low Emissions Reconstruction of No. 2 Unit in No. 1 Plant of Nayong Power Plant
Guizhou Jinyuan Co., Ltd. Nayong Power Plant No. 1 unit No. 2 unit transformation of denitration system of ultra-low emission renovation project (SNCR + SCR denitrification process), this project adopts the general contracting method, including the related system and its ancillary equipment, civil construction (structure) Surveying, designing, manufacturing, supervision and inspection of buildings and structures (including foundation treatment), transportation, warehousing, pre-assembly sites, removal of existing equipment (including displacement and restoration of construction equipment, etc.) and transportation to the place designated by the owner , And new equipment installation, commissioning, technical services, training, commissioning and performance assurance of the entire system and the final delivery and production, etc.; and to meet the needs of normal operation. This tender covers the catalyst recovery and disposal of catalysts whose service life is expired and damaged.
2000
3
C02000111SZ02WZ070000003
Retrofit of Electric Bag Dust Collector for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
The transformation of the electric bag dust collector of the No. 2 generating unit No. 1 unit of Nayong Power Plant No. 1 in Guizhou Jinyuan Co., Ltd. has adopted the EPC general contracting method, including the related systems and its associated equipment, civil construction (structure) (including Ground investigation, design, manufacture, supervision and inspection, transportation, warehousing, pre-assembly site, removal of existing equipment (including displacement and restoration of construction equipment, etc.) and transportation to the site designated by the owner, and new equipment Installation, commissioning, technical service, training, commissioning, and performance assurance of the entire system, final delivery, etc.; and can meet the needs of normal operation. The scope of this tender includes "four connections and one leveling" and does not include the corresponding performance evaluation and test technical services for this project.
2000
4
C02000111SZ02WZ070000004
Reconstruction of Electrostatic Precipitator for No. 1 and No.
Guizhou Jinyuan Co., Ltd. Yaxi Power Plant # 1 and 2 furnaces for electrostatic precipitator renovation, including system equipment design, procurement, manufacturing, supply, transportation, installation, inspection, test operation, assessment operation, performance testing, deficiencies, training And after-sales service after the equipment is handed over
3000
Third, bidder qualification requirements
(a) Basic qualification requirements
1. The bidder shall be a registered company in China with independent legal personality.
2. The bidder has the ability to design, manufacture, and have the same or similar equipment as the bidding equipment in terms of professional technology, equipment and facilities, personnel organization, performance and experience, and corresponding qualifications and capabilities in quality control, operation and management, etc. (Bidders shall provide Designation, production, manufacturing licenses and other qualification certificates issued by national or provincial authorities.
3. With a sound quality management system, it must hold an ISO9001 quality management system certification issued by a nationally recognized qualification agency or an equivalent quality management system certification.
4. There is no major safety accident in the past 3 years, or there are no two or more major safety accidents in the past 3 years, or there is no major safety accident in the past 1 year, or within the group company system within the past 1 year Personal death.
5. No fraudulent bid, serious breach of contract, or any contract was cancelled due to the bidder’s own reasons in the last three years. No bad record was recorded in the “Power Supply Contract/Bid Indicating Bad Record Information Collection Form” of State Power Investment Corporation. .
6. Not being ordered to suspend business, property was taken over, frozen and bankruptcy.
7. Has good bank credit and business reputation, good operating conditions, no capital insolvency or loss for two consecutive years.
8. There is no real or potential conflict of interest between the bidder and the bidder. Units in charge of the same person or different units with controlling and management relationships may not bid on the same bid. For bids in the same project that have mutual restraint (such as supervision and supervision), different units whose person in charge is the same person or who have a controlling or management relationship may not bid on the corresponding section of the same project.
(II) Special qualification requirements
No.
Section name
Special qualifications
1.
Conversion of Desulphurization System for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
1. Accept Commonwealth bids. Subcontracting is allowed, except for the design part and the supply part of the main equipment.
2. If the bidder subcontracts the construction part, he must submit the qualification documents of the subcontractor with the bidding documents as required by the bidding documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered as invalid.
3. The bidder has the performance of total contracting. Within the last 5 years (from September 30, 2011 to the deadline for bids), it has at least two performances of desulfurization systems for new-built or retrofitted thermal power projects of 300MW and above, and it has been operating safely for two years. And above. The Bidder shall provide the contract homepage, signature page, main parameter page, copy of the supply scope page, and the owner's commissioning certification materials (including contact person and contact information). Incomplete information shall be deemed invalid.
4. Project Manager Qualification: The recommended project manager shall have project manager qualifications and a similar project project manager to manage performance, and be no older than 55 years of age.
5. The bidder shall provide the bidder with a brief description of the bidder and all subcontractors (if subcontracted), including but not limited to: company status, project performance, quality management system certification, honorary certificate, no major A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit shall have an effective safety production license.
2.
Transformation of Denitrification System for Ultra Low Emissions Reconstruction of No. 2 Unit in Nayong Power Plant No. 1
1. Accept the Commonwealth bid. However, except for the design part and the supply part of the main equipment, the environmental protection engineering company with SCR process is the lead unit.
2. If the bidder sub-contracts part of the construction, he must submit the qualification documents of the sub-contractor with the bid documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered as invalid.
3. The bidder shall provide a brief description of the bidders and all subcontractors (if subcontracted) along with the bid documents, including but not limited to: company status, project performance, quality management system certification, honorary certificate, no significant A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
4. The bidder shall have achieved at least two performances of SCR process denitration systems for newly constructed or retrofitted thermal power projects in the past five years (from September 30, 2011 to the deadline for bids) and have been operating safely for two years or more. ; And has at least one 300MW and above grade new or transformation of thermal power project SNCR process denitration system performance, and has been safe for one year or more. The bidder provided the contract homepage, signature page, main parameter page, copy of the supply scope page, and provided the owner's commissioning certification materials (including ink> contact person and contact information) and other data, and the incomplete information was deemed invalid.
5. Project Manager Qualification: The recommended project manager shall have project manager qualifications, and have similar project project manager management performance, and be no older than 55 years of age.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit shall have an effective safety production license.
3.
Retrofit of Electric Bag Dust Collector for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
1. Accept the Commonwealth bid. Subcontracting is allowed, except for the design part and the supply part of the main equipment.
2. If the bidder sub-contracts the construction, he must submit the qualification documents of the sub-contractor with the bid documents according to the requirements of the bidding documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered invalid.
3. The bidder has the performance of the general contractor. In the last 5 years (from September 30, 2011 to the deadline for bid submission), the performance of the electric bag dust collector of at least two new-built or reformed thermal power projects with a rating of 300 MW or above has been achieved. Two years or more. The Bidder shall provide the contract homepage, signature page, main parameter page, copy of the supply scope page, and the owner's commissioning certification materials (including contact person and contact information). Incomplete information shall be deemed invalid.
4. Project Manager Qualification: The recommended project manager should have project manager qualifications and a similar project project manager to manage performance, and be no older than 55 years of age.
5. The bidder shall provide a brief description of the bidders and all subcontractors (if subcontracted) along with the bid documents, including but not limited to: company status, project performance, quality management system certification, honorary certificate, no significant A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit should have an effective safety production license.
4.
Reconstruction of Electrostatic Precipitator for No. 1 and No.
1. Accept the Commonwealth bid. Subcontracting is allowed, except for the design part and the supply part of the main equipment.
2. If the bidder sub-contracts part of the construction, he must submit the qualification documents of the sub-contractor with the bid documents in accordance with the requirements of the bidding documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered as invalid.
3. The bidders have total contract performance, and have achieved at least two performances of dust collectors for newly constructed or retrofitted thermal power projects of 300MW and above in the past 5 years (from September 30, 2011 to the deadline for bids) and have been operating safely for two years. the above. The bidder provided the contract homepage, signature page, main parameter page, and copy of the supply scope page, and provided the owner's commissioning certification materials (including contact person and contact information). If the information is not complete, it shall be deemed invalid.
4. Project Manager Qualification: The recommended project manager shall have project manager qualifications and a similar project project manager to manage the performance. The age shall not exceed 55 years of age.
5. The bidder shall provide the bidder with a brief description of the bidder and all subcontractors (if subcontracted), including but not limited to: the company's situation, project performance, quality management system certification, honorary certificate, no significant A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit should have an effective safety production license.
Fourth, the issue of tender documents
(I) Time and Place of Issuance of Bidding Documents
From September 29, 2016 to October 10, 2016 (excluding official holidays), from 9:00 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon.
(II) Price of Bidding Documents
The bidding documents must be paid for the cost of the bidding documents. The prices of the bidding documents are detailed in the “Bid List of Bidding Conditions”. The bidding documents are purchased voluntarily. Once sold, the fees will not be refunded.
(III) Ways of Offering Bidding Documents
Online sale, does not accept the on-site purchase.



Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

I. Basic situation of the project
Source of funds for the project: Self-financing and bank loans
Second, the scope of tender
1. List of tender bids
2. Main construction content
No.
Tender number
Section name
main indicators
Bidding Document Price (yuan)
1
C02000111SZ02WZ070000001
Conversion of Desulphurization System for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
Conversion of desulphurization system for ultra-low emission of No. 2 unit of No. 2 unit of No. 1 unit of Nayong Power Plant of Guizhou Jinyuan Co., Ltd. This project adopts EPC general contracting method, including related systems and its associated equipment, civil buildings (structures) (including ground treatment) survey, design, manufacture, supervision and inspection, transportation, warehousing, pre-assembly site, removal of existing equipment (including displacement and restoration of construction equipment, etc.) and transportation to the site designated by the owner, and New equipment installation, commissioning, technical service, training, commissioning and performance assurance of the entire system and final delivery and commissioning, etc.; and can meet the needs of normal operation. The scope of this tender includes "four connections and one leveling" and does not include the corresponding performance evaluation test technical services for this project.
2000
2
C02000111SZ02WZ070000002
Transformation of Denitrification System for Ultra Low Emissions Reconstruction of No. 2 Unit in No. 1 Plant of Nayong Power Plant
Guizhou Jinyuan Co., Ltd. No. 1 unit of Nayong Power Plant No. 1 unit transformation of denitration system of No. 2 unit (SNCR + SCR denitrification process), this project adopts the general contracting method, including related systems and their associated equipment, civil construction (structure) Surveying, designing, manufacturing, supervision and inspection of buildings and structures (including foundation treatment), transportation, warehousing, pre-assembly sites, removal of existing equipment (including displacement and restoration of construction equipment, etc.) and transportation to the place designated by the owner , And new equipment installation, commissioning, technical services, training, commissioning and performance assurance of the entire system and the final delivery and production, etc.; and to meet the needs of normal operation. This tender covers the catalyst recovery and disposal of catalysts whose service life is expired and damaged.
2000
3
C02000111SZ02WZ070000003
Retrofit of Electric Bag Dust Collector for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
The transformation of the electric bag dust collector of the No. 2 generating unit No. 1 unit of Nayong Power Plant No. 1 in Guizhou Jinyuan Co., Ltd. has adopted the EPC general contracting method, including the related systems and its associated equipment, civil construction (structure) (including Ground investigation, design, manufacture, supervision and inspection, transportation, warehousing, pre-assembly site, removal of existing equipment (including displacement and restoration of construction equipment, etc.) and transportation to the site designated by the owner, and new equipment Installation, commissioning, technical service, training, commissioning, and performance assurance of the entire system, final delivery, etc.; and can meet the needs of normal operation. The scope of this tender includes "four connections and one leveling" and does not include the corresponding performance evaluation and test technical services for this project.
2000
4
C02000111SZ02WZ070000004
Reconstruction of Electrostatic Precipitator for No. 1 and No.
Guizhou Jinyuan Co., Ltd. Yaxi Power Plant # 1 and 2 furnaces for electrostatic precipitator renovation, including system equipment design, procurement, manufacturing, supply, transportation, installation, inspection, test operation, assessment operation, performance testing, deficiencies, training And after-sales service after the equipment is handed over
3000
Third, bidder qualification requirements
(a) Basic qualification requirements
1. The bidder shall be a registered company in China with independent legal personality.
2. The bidder has the ability to design, manufacture, and have the same or similar equipment as the bidding equipment in terms of professional technology, equipment and facilities, personnel organization, performance and experience, and corresponding qualifications and capabilities in quality control, operation and management, etc. (Bidders shall provide Designation, production, manufacturing licenses and other qualification certificates issued by national or provincial authorities.
3. With a perfect quality management system, it must hold an ISO9001 quality management system certification issued by a nationally recognized qualification agency or an equivalent quality management system certification.
4. There is no major safety accident in the past 3 years, or there are no two or more major safety accidents in the past 3 years, or there is no major safety accident in the past 1 year, or within the group company system within the past 1 year Personal death.
5. No fraudulent bid, serious breach of contract, or any contract was cancelled due to the bidder’s own reasons in the last three years. No bad record was recorded in the “Power Supply Contract/Bid Indicating Bad Record Information Collection Form” of State Power Investment Corporation. .
6. Not being ordered to suspend business, property was taken over, frozen and bankruptcy.
7. Has good bank credit and business reputation, good operating conditions, no capital insolvency or loss for two consecutive years.
8. There is no real or potential conflict of interest between the bidder and the bidder. Units in charge of the same person or different units with controlling and management relationships may not bid on the same bid. For bids in the same project that have mutual restraint (such as supervision and supervision), different units whose person in charge is the same person or who have a controlling or management relationship may not bid on the corresponding section of the same project.
(II) Special qualification requirements
No.
Section name
Special qualifications
1.
Conversion of Desulphurization System for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
1. Accept Commonwealth bids. Subcontracting is allowed, except for the design part and the supply part of the main equipment.
2. If the bidder subcontracts the construction part, he must submit the qualification documents of the subcontractor with the bidding documents as required by the bidding documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered as invalid.
3. The bidder has the performance of total contracting. Within the last 5 years (from September 30, 2011 to the deadline for bids), it has at least two performances of desulfurization systems for new-built or retrofitted thermal power projects of 300MW and above, and it has been operating safely for two years. And above. The Bidder shall provide the contract homepage, signature page, main parameter page, copy of the supply scope page, and the owner's commissioning certification materials (including contact person and contact information). Incomplete information shall be deemed invalid.
4. Project Manager Qualification: The recommended project manager shall have project manager qualifications and a similar project project manager to manage performance, and be no older than 55 years of age.
5. The bidder shall provide the bidder with a brief description of the bidder and all subcontractors (if subcontracted), including but not limited to: company status, project performance, quality management system certification, honorary certificate, no major A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit shall have an effective safety production license.
2.
Transformation of Denitrification System for Ultra Low Emissions Reconstruction of No. 2 Unit in Nayong Power Plant No. 1
1. Accept the Commonwealth bid. However, except for the design part and the supply part of the main equipment, the environmental protection engineering company with SCR process is the lead unit.
2. If the bidder sub-contracts part of the construction, he must submit the qualification documents of the sub-contractor with the bid documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered as invalid.
3. The bidder shall provide a brief description of the bidders and all subcontractors (if subcontracted) along with the bid documents, including but not limited to: company status, project performance, quality management system certification, honorary certificate, no significant A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
4. The bidder shall have achieved at least two performances of SCR process denitration systems for newly constructed or retrofitted thermal power projects in the past five years (from September 30, 2011 to the deadline for bids) and have been operating safely for two years or more. ; And has at least one 300MW and above grade new or transformation of thermal power project SNCR process denitration system performance, and has been safe for one year or more. The bidder provided the contract homepage, signature page, main parameter page, copy of the supply scope page, and provided the owner's commissioning certification materials (including ink> contact person and contact information) and other data, and the incomplete information was deemed invalid.
5. Project Manager Qualification: The recommended project manager shall have project manager qualifications, and have similar project project manager management performance, and be no older than 55 years of age.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit should have an effective safety production license.
3.
Retrofit of Electric Bag Dust Collector for Ultra-low Emission Improvement Project of No. 2 Unit in Nayong Power Plant No. 1
1. Accept the Commonwealth bid. Subcontracting is allowed, except for the design part and the supply part of the main equipment.
2. If the bidder sub-contracts part of the construction, he must submit the qualification documents of the sub-contractor with the bid documents in accordance with the requirements of the bidding documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered invalid.
3. The bidder has the performance of the general contractor. In the last 5 years (from September 30, 2011 to the deadline for bid submission), the performance of the electric bag dust collector of at least two new-built or reformed thermal power projects with a rating of 300 MW or above has been achieved. Two years or more. The Bidder shall provide the contract homepage, signature page, main parameter page, copy of the supply scope page, and the owner's commissioning certification materials (including contact person and contact information). Incomplete information shall be deemed invalid.
4. Project Manager Qualification: The recommended project manager shall have project manager qualifications and a similar project project manager to manage the performance. The age shall not exceed 55 years of age.
5. The bidder shall provide a brief description of the bidders and all subcontractors (if subcontracted) along with the bid documents, including but not limited to: company status, project performance, quality management system certification, honorary certificate, no significant A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or more qualifications of contractors for environmental protection engineering or general qualifications for general contracting of power engineering construction. The construction unit shall have an effective safety production license.
4.
Reconstruction of Electrostatic Precipitator for No. 1 and No.
1. Accept the Commonwealth bid. Subcontracting is allowed, except for the design part and the supply part of the main equipment.
2. If the bidder sub-contracts the construction, he must submit the qualification documents of the sub-contractor with the bid documents according to the requirements of the bidding documents for review by the bid inviting party. If the bidder does not provide or provide information that does not meet the requirements of the bidding documents, it is considered invalid.
3. The bidders have total contract performance, and have achieved at least two performances of dust collectors for newly constructed or retrofitted thermal power projects of 300MW and above in the past five years (from September 30, 2011 to the deadline for bids), and have been operating safely for two years. the above. The bidder provided the contract homepage, signature page, main parameter page, and copy of the supply scope page, and provided the owner's commissioned proof materials (including contact person and contact information). If the information is not complete, it shall be deemed invalid.
4. Project Manager Qualification: The recommended project manager shall have project manager qualifications and a similar project project manager to manage the performance. The age shall not exceed 55 years of age.
5. The bidder shall provide the bidder with a brief description of the bidder and all subcontractors (if subcontracted), including but not limited to: company status, project performance, quality management system certification, honorary certificate, no major A letter of declaration on the above-mentioned safety accidents, or personal injury accidents, and major and/or above quality accidents.
6. Bidder's qualification requirements:
(1) Design: Class A qualification for special design of environmental engineering (air pollution control project).
(2) Construction: Grade two or higher qualification of environmental engineering contractor or general contractor of power engineering construction grade or above. The construction unit should have an effective safety production license.
Fourth, the issue of tender documents
(I) Time and Place of Issuance of Bidding Documents
From September 29, 2016 to October 10, 2016 (excluding official holidays), from 9:00 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon.
(II) Price of Bidding Documents
The bidding documents must be paid for the cost of the bidding documents. The prices of the bidding documents are detailed in the “Bid List of Bidding Conditions”. The bidding documents are purchased voluntarily. Once sold, the fees will not be refunded.
(III) Ways of Offering Bidding Documents
Online sale, does not accept the on-site purchase.